
We have Spanish speaking auditors capable to perform safety audits in land portable or heliportable seismic crews prior start-up, these audits includes:
Safe Handling and Use of Explosives
Safe Driving Habits
Line Responsibility
Helicopter Safety
A precise concise report will be generated to the Oil Operating Company observing the weakness of the crew concerning safety matters and how to improve and correct those drawbacks.
In the case of a near miss, first –aid case ( FAC), restricted work case ( RWC), lost time injury (LTI) and a fatality (FAL), a committee is set-up to investigate and analyze each and every issue, full report transcribed. The object of the committee is to use each issue as a tool and advise all line crews of each and every case, as the intelligent gained from the investigation can be the preventive action necessary to avoid similar incidents.
Our ultimate goal is a project with no lost time injuries ( LTIs) and in addition all personnel accepting that safety and quality control will work hand-in-hand, they are of equal importance and finally a safe crew enhances quality control and ultimately production.
